Luffing Coordinate Stacker
Machine Type
Facility
Millennium Coal Mine QLD, Australia
Capacity
2 x 1,700tph Stackers onto 250,000 tonne stock pile
Machine Name
Millennium 1 and Millennium 2
Material
Coal
Description
Luffing boom, long traveling with offset yard conveyors and tripper on shared rails
Commissioned
2005
Client
Millennium Coal Pty Ltd, now Peabody Pacific Pty Limited
PROJECT SUMMARY
The development of a coal preparation plant was awarded to ACT. A critical component in the daily operation of the coal preparation plant are two 1,200 tph product coal stackers. Christof and Helmut were engaged to design, develop detail design documentation and design audit these stackers.
PROJECT INCLUDED
- Structural Analysis: Analysis of stacker structure for stress and buckling to AS4324.1.
- Fatigue Analysis: Evaluation of structural stresses for nominal fatigue life capacity as indicated in AS4324.1 and AS4100 or alternatively BS7608.
- Mechanical analysis of stacker components for stress and serviceability to AS4324.1 and/or AS1418.
- Structural and mechanical detailing in the form of detailed assemblies, including equipment designations and material lists.
- Pre-commissioning Audit of the stacker (mechanical and structural components) to AS4324.1 and Commissioning.